Home

PH Detector Technology Group

LHC Gas Systems, Maintenance and Operations

Gas Systems's Operational Procedures

 

 


Procedures Common to All Gas Systems
   Action         Procedure

1

Reset an ELMB that has locked out (values not updated, zeroes):  
       

2

Re-load the Gas Controls Application Program on the Schneider Premium PLC

 
       

3

Re-boot the Schneider Premium PLC

 
       

4

Cleaning the water XMFC in the RPC Humidifier Rack  
       

5

Profibus Diagnostic Indications shown on VIPA type Profibus Connector

 
       

6

Pressurize the gas pipes to able to start a close-loop gas system  
       

7

Increase gas flow in a closed-loop system  
       

8

Control MFC oscillations (PID problem)  
       

9

Flammable Gas Operations

      ALICE
      ATLAS
      CMS
 

 

https://edms.cern.ch/document/880050

https://edms.cern.ch/document/933334

https://edms.cern.ch/document/889734

       

10

How to RESTART A GAS SYSTEM after a GENERAL L3 GAS ALARM (triggered by a gas detection head)

 

https://edms.cern.ch/document/930406

       

11

Calibration BINOS IR  

https://edms.cern.ch/document/926903

       
12 Teledyne Trace O2 analyser  

https://edms.cern.ch/document/1057077

       
       


Procedures System-Specific
Sub-system    Procedure
ALICE    
     
     
ATLAS    
TGC  

 

Restarting TGC after a global stop:

  • Before starting the system, switch on the liquid pump of N-PENTANE to build some pressure. Leave it in Force mode after the start and put back the pump in Auto mode. Don’t forget to switch on the liquefier in Manual mode and leave it manual.

  • Disable flowcell alarm (Line 9 in RECIPE CONSTANT of Distribution module). When flowcells in/out have reasonable values, enable the alarm.


RPC   Before the system cab be restarted the high pressure buffer must be filled at least up to 500 mbar

     
CMS    
N2 Supply Alarm  

The SMS message "Bad – CMSAUX_En_PSL004" from CMS means that the N2 batteries are in use, instead of the dewars.

You can check the pressure in the batteries in this link.

Explanation/Screenshot of the Gas Supply Status Page > (.pdf)


     
LHCb    
     
RICH1  

https://edms.cern.ch/document/1056403


     
TOTEM    
     
     

Last Updated Tuesday, June 15, 2010 by MC